Skip to content
travel_transport

Transport in Uzbekistan

Uzbekistan News Editorial team · AI-written, reviewed under our editorial standards · · Reading time 6min read · Views 0 ·
Key — Uzbekistan's transport infrastructure has seen mixed development, with significant investment in air travel and high-speed rail, while road networks face deterioration.

Uzbekistan's overland transport infrastructure declined in the post-Soviet era, but air transport received substantial government investment in the early 2000s as airport modernization projects were undertaken. Improvements have since been made to the surface transport network including the construction of the Tashkent–Samarkand high-speed rail line.

As of March 2017, the total length of Uzbekistan's main railway network is 4,669 kilometres (2,901 mi), of which 2,446 km (1,520 mi) is electrified. Uzbekistan's one active tramway system is the Samarkand tram, and there are also trolleybuses in Urgench, both opened after the independence.

Road and Highway Networks

As of 2005, Uzbekistan had 84,400 km (52,400 mi) of roads, about 72,000 km (45,000 mi) of which were paved. The road infrastructure is deteriorating, particularly outside of Tashkent. No significant highway projects were underway in 2006.

The M39 Highway, connecting Tashkent and Samarkand is a 4-laned road in some 300 km (190 mi) of its length, although poorly maintained and without carriageway separation in most of its length. In January, 2017, the Kazakhstan and Uzbekistan governments made an agreement to reopen the 65 km (40 mi) section of this highway which passed through Kazakhstan that had been closed for ten years, avoiding the detour via Guliston.

Road Classification and Projects

The highways in Uzbekistan are divided into three groups based on the level of their significance whose names differ by a prefix on their code. On July 2024, in a cabinet ruling, the Soviet-era highway numbers were retained for "roads of international significance", but the road numbering was overhauled for "roads of state significance" and "roads of local significance".

Below are the "highways of international significance", with a prefix "M" or "A", inheritted from the Soviet road network. The next level of roadways in Uzbekistan are "roads of state significance" (davlat ahamiyatiga molik avtomobil yoʻllari), their codes consisting of 3 digints, and being designated with a prefix "D" (for davlat, meaning "state"). These roads are designated from D001 to D240, with branches and variants being labelled using minuscule latin letters, e.g. "D025e" (862nd km of M39 — Chinoz).

In September 2019, The Asian Infrastructure Investment Bank proposed the Bukhara Road Network Improvement Project to improve the multiple assets of cross-border roads in Bukhara and the road networks in Karakalpakstan and Khorezm regions. The project finances were approved in June of 2020 and were estimated to take 214.7 million USD.

  • The M37 Highway starts from Samarkand, reaching west to the Turkmen border, via Navoiy and Bukhara.
  • The A373 Highway starts from Tashkent, going east through Kokand of Fergana Region, and ends at the Kyrgyz border.

The Tashkent Metro is the only rapid transit system in Uzbekistan. It was the only such system in Central Asia, until the opening of the Almaty Metro.

This article was written with AI assistance from multiple news reports and is reviewed by our editors under our editorial principles. Editorial Standards · Tips & Contact

How did you like this post?

Comments 0

Be the first to comment

Contact us

← Uzbekistan News Home
Uzbekistan News Get new posts by emailSubscribe to receive new content via email. Unsubscribe anytime.
Was this helpful?Share it with friends & social